
Evergreens on either side of front door moved to back property line (got poinson ivy). Purchased stained-glass for master bedroom, received quotes for fire detection/security system, gas tank linked to house. Progress on external shingles/trim. Exterior doors arrived and installed (wrong front door, will need to be swapped). Plumber on vacation. Wood species for kitchen approved, with construction on cabinets beginning 8/13 (with delivery expected mid-October). Purchase of electrical fixtures begun. Working out final details of interior trim scheme. Researching media system options and soundproofing. Subfloor in old family room removed, allowing new wood flooring in new kitchen to be level with wood flooring in existing living room.
No comments:
Post a Comment