The last week of the year was spent, in addition to holiday celebration, building out the pantry closet in the dining room area. Unfortunately, this took longer than expected, but the utility of the closet will be well worth it. Slides for the drawers have been installed, and dovetailed drawers will be made and installed in January. The downstairs bathroom has been repainted, the basement stairwell has been repainted, so with the exception of these drawers, the first floor is completed.
After a brief administrative catch up, and the servicing of some power tools, the new year will include completion of the Pantry drawers, painting of the stiarwell to the 2nd floor, painting of the 2nd floor hall and wainscot, painting of the boy's bathroom, final painting of the four bedrooms, construction for built-ins in the four bedroom closets, and final trim and painting of the master bathroom.