Sunday, August 5, 2007

Week Ending 8/04/07



This week our propane tank was filled, the plumber and electrician did most of their work, and we met with the HVAC people. Plumbing would have been finished but the fixtures, which are now all purchased, have not all come in. We hope they will arrive while the plumber is on vacation next week. Stained glass was picked out for the master bedroom, final kitchen plans were made, as I'm trying to get the cabinet maker rolling (8-week turnaround). Ninth dumpster (at least), and more siding and exterior trim went up. When the dumpster was swapped out the driver backed into my neighbor's Porsche, pushing it back three feet and almost into my car. Plans for soundproofing and sound systems are now under way, as insulation, sheetrock and hardwood floors are soon to follow. I also was called upon to remove the stairwell walls and remaining living room walls (where I found a live cut wire and a great deal of water).