



Many things happening this week. Shingles began going on roof. Majority of interior and exterior walls now framed. Backhoe on site and digging footers, footers poured. Entire old second floor now gone. All old cedar shakes gone. Windows delivered. HVAC work begun. Someone dropped their coffee on our new basement rug. Two Master Bedroom windows not as planned, boarded over. Pastor Gish helped me remove roses and lavendar (for transplant to the parsonage) to save them from the backhoe (and neary died from heat doing it). He promised visiting rights. On 7th dumpster. 4 pics this week including mudroom foundation, back hoe and back porch, eyebrow frame for large window in master bath and Jessica helping me remove shingles.
No comments:
Post a Comment