

Difficult to show the progress in the past week, but there has been much. The inside walls have been built out for most of the downstairs and half of the upstairs. In addition, having completed up to the left dormer on the main house, the builders have used the same measurements to compete most of the remaining exterior and interior walls and joists, all of which are stacked neatly on the lawn. It will be a fast push for the remainder to be assembled. Our windows have arrived, awaiting installation. The interior picture here shows the "new downstairs," from the front door to the old back porch, with all walls opened up.
No comments:
Post a Comment