Friday, September 26, 2008

Week Ending 09/20/2008


- With the one exception of the garage door, all exterior painting is now completed.
- Every day something is painted inside.
- Nearly every day some trim is installed.
- The lawn has been regraded, and most of the previous landscaping (which has outgrown the location) has been removed. The lawn has been seeded, and is coming up.
- As I cut the old lawn, just prior to the yardwork, the lawn mower broke! The deck split in half due to rust. It is likely the new lawn will get a new mower by the spring. Timing.
- The entire fireplace area is being reconstructed, partially due to code requirements for the new wood stove, which is due for installation 10/7. The following picture shows the fireplace wall with previous trim removed, with the hearth removed, and with the wood floor extended to facilitate code and the new tile for the hearth (which is due to arrive any day).